[infinispan-issues] [JBoss JIRA] (ISPN-9827) The Hot Rod client should apply topology changes after the response has been processed

Radim Vansa (Jira) issues at jboss.org
Fri Dec 14 06:15:00 EST 2018


    [ https://issues.jboss.org/browse/ISPN-9827?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13674752#comment-13674752 ] 

Radim Vansa commented on ISPN-9827:
-----------------------------------

The problem was that the FTPing operation was already gone from the operations map, held only in the `operation` field.
So the remove in {{HotRodDecoder:126}}  should be changed to get and the remove should be issued after line {{144}}, or maybe even better the current {{operation}} should be added to the list returned by {{allCompleteFuture()}}.

> The Hot Rod client should apply topology changes after the response has been processed
> --------------------------------------------------------------------------------------
>
>                 Key: ISPN-9827
>                 URL: https://issues.jboss.org/browse/ISPN-9827
>             Project: Infinispan
>          Issue Type: Bug
>    Affects Versions: 10.0.0.Alpha2, 9.4.4.Final
>            Reporter: Tristan Tarrant
>            Assignee: Tristan Tarrant
>            Priority: Major
>
> The Hot Rod client applies topology changes to the connection pool while it is processing the header. This could cause the channel on which it is reading to be closed before the response has been completely processed. Topology changes should be applied when the operation completes.



--
This message was sent by Atlassian Jira
(v7.12.1#712002)


More information about the infinispan-issues mailing list