[infinispan-issues] [JBoss JIRA] (ISPN-8859) DistTopologyChangeUnderLoadSingleOwnerTest takes too long

Radim Vansa (JIRA) issues at jboss.org
Thu Feb 22 13:02:00 EST 2018


     [ https://issues.jboss.org/browse/ISPN-8859?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Radim Vansa updated ISPN-8859:
------------------------------
    Status: Open  (was: New)


> DistTopologyChangeUnderLoadSingleOwnerTest takes too long
> ---------------------------------------------------------
>
>                 Key: ISPN-8859
>                 URL: https://issues.jboss.org/browse/ISPN-8859
>             Project: Infinispan
>          Issue Type: Bug
>          Components: Core
>    Affects Versions: 9.2.0.CR2
>            Reporter: Radim Vansa
>            Assignee: Radim Vansa
>
> The test starts 2 nodes (A and B), kills A and starts C. Test cleanup stops C and gets stuck in DCM.undefineConfiguration as the method is iterating through caches and finds out that {{___counter_configuration}} is not started yet, waiting for initial transfer.
> The node waits for initial ST because by the time C starts the cache is degraded on B and initial transfer cannot continue.
> Proper fix would be letting the cache start but operations throwing AvailabilityException, but workaround would be just keeping wired unstarted caches in another collection directly for the purpose of undefineConfiguration.



--
This message was sent by Atlassian JIRA
(v7.5.0#75005)


More information about the infinispan-issues mailing list