7.1.1 is scheduled for release on March 7 (next Wed), so next Tuesday.

On 2/29/12 9:21 AM, Pete Muir wrote:
> Serge/Tom, can you do this? Brian, when is the deadline?
>
> On 29 Feb 2012, at 13:56, Brian Stansberry wrote:
>
>> Hi Pete,
>>
>> In EAP 6 the test/topic and test/queue destinations are removed from standalone-xxx.xml (and domain.xml). We'd like to do the same in upstream in 7.1.1 or 7.2[1].
>>
>> For 7.1.1 can any quickstarts that use these destinations be modified to set up their own destinations?
>>
>> --
>> Brian Stansberry