[jboss-dev-forums] [Design of JBoss jBPM] - Re: Modelling notation - a Business Analyst perspective
tom.baeyens@jboss.com
do-not-reply at jboss.com
Mon Dec 11 07:04:35 EST 2006
anonymous wrote : One caveat: I have seen situations where the delivery of a solution takes a back seat and modelling becomes an end in itself. Perhaps this is something that should be thought about as part of BPM project methodology rather than the notation, but it would be great if the notation could limit such extravagance.
|
exactly. that is the key issue which still needs to be addressed. good to see that others think in the same direction as us :-)
maybe the GUI tools should have a level indicator that enables/disables these levels...
View the original post : http://www.jboss.com/index.html?module=bb&op=viewtopic&p=3992748#3992748
Reply to the post : http://www.jboss.com/index.html?module=bb&op=posting&mode=reply&p=3992748