I guess we should consider an option where we can shutdown and failover clients.

anonymous wrote : When I bring server0 back, I think server0 wil have no client connections, and this will lead to imbalance load between server. Is this correct? 

This is correct at this point. 

Server0 will assume new connections.. .but we don't have a recover of the failover at this point. This is something we have discussed... and it might be scheduled for future releases.

View the original post : http://www.jboss.com/index.html?module=bb&op=viewtopic&p=4003464#4003464

Reply to the post : http://www.jboss.com/index.html?module=bb&op=posting&mode=reply&p=4003464