[jboss-dev-forums] [Design the new POJO MicroContainer] - aop-mc-int tests take too long

adrian@jboss.org do-not-reply at jboss.com
Sat Nov 24 11:36:37 EST 2007


It is nice to have the different builds of the aop-mc-int tests
but they take too long.

Is there a way we can choose one set of the tests for the normal build
with the other configurations optional?
Or some way to disable all but one when doing a release?

During the release process it wants to build and run the tests multiple times.
Not including the normal build during manual preparation for the release:
1) Test with the release profile mvn -Prelease install
2) Dry run of the release mvn release:prepare -DdryRun=true
3) Preparation of the release mvn release:prepare

With the current tests in aop-mc-int this would take hours. And you
can't pass -Daop.tests.skip to these plugins.

View the original post : http://www.jboss.com/index.html?module=bb&op=viewtopic&p=4107490#4107490

Reply to the post : http://www.jboss.com/index.html?module=bb&op=posting&mode=reply&p=4107490



More information about the jboss-dev-forums mailing list