Ok here's the patch
http://viewvc.jboss.org/cgi-bin/viewvc.cgi/jbossas?view=rev&revision=71792

NOTE: Because JBoss Messaging has a default limit of only 10 message deliveries
I had to change the stress test to only run 5 iterations.
This needs revisiting. i.e. we aren't going to reproduce the race condition (if it reoccurs)
with only 5 iterations.
See the FIXME in the test.
http://viewvc.jboss.org/cgi-bin/viewvc.cgi/jbossas/trunk/testsuite/src/main/org/jboss/test/jca/test/ExecuteJMSDuringRollbackStressTestCase.java?r1=71792&r2=71791&pathrev=71792

View the original post : http://www.jboss.com/index.html?module=bb&op=viewtopic&p=4142397#4142397

Reply to the post : http://www.jboss.com/index.html?module=bb&op=posting&mode=reply&p=4142397