[jboss-dev-forums] [Design of Messaging on JBoss (Messaging/JBoss)] - Re: Large message code review
timfox
do-not-reply at jboss.com
Tue Dec 9 04:26:47 EST 2008
***
9.Flow control - for large message flow control should be called before adding adding to buffer APART from last chunk which should have flow control called before consumption, otherwise could flood the buffer.
***
View the original post : http://www.jboss.com/index.html?module=bb&op=viewtopic&p=4195259#4195259
Reply to the post : http://www.jboss.com/index.html?module=bb&op=posting&mode=reply&p=4195259
More information about the jboss-dev-forums
mailing list