[jboss-dev-forums] [Design of Messaging on JBoss (Messaging/JBoss)] - Moving slow tests out into timing
timfox
do-not-reply at jboss.com
Fri Jul 4 07:41:47 EDT 2008
As discussed at the F2F can everyone start moving their slow tests out into the timing area.
org.jboss.messaging.tests.timing.
We should aim to get a unit test run < 30 seconds.
Any tests (e.g. journal tests -clebert) which do nothing apart from measure performance belong neither in the unit test suite nor the timing suite.
The ant script will need to be updated to exclude timing and concurrent tests.
View the original post : http://www.jboss.com/index.html?module=bb&op=viewtopic&p=4162528#4162528
Reply to the post : http://www.jboss.com/index.html?module=bb&op=posting&mode=reply&p=4162528
More information about the jboss-dev-forums
mailing list