[jboss-dev-forums] [Design of Messaging on JBoss (Messaging/JBoss)] - Re: Changes on the JBM stack on JBoss5

vblagojevic@jboss.com do-not-reply at jboss.com
Mon Nov 10 09:42:53 EST 2008


I was able to recreate this in my own bare jgroups tests. I made a test where 4 members join and do a separate getState. The test does this repeatedly 10 times. Having loopback true fails at least on of these 10 runs. Having loopback false gives much better performance.

I have isolated the problem and I am testing a fix that would handle this problem regardless of loopback being turned of or on!




View the original post : http://www.jboss.com/index.html?module=bb&op=viewtopic&p=4188144#4188144

Reply to the post : http://www.jboss.com/index.html?module=bb&op=posting&mode=reply&p=4188144



More information about the jboss-dev-forums mailing list