[JBoss-dev] Re: Remaining tasks for JBAS 4.0.5.CR1

Scott M Stark scott.stark at jboss.org
Wed Aug 30 10:46:05 EDT 2006


I agree with the testsuite strategy of addressing the other vms for the 
final release.

Dimitris Andreadis wrote:
> Hi,
>
> There are a couple of things left for the jbas 4.0.5.CR1 release.
>
> There are some harmless but annoying warnings that appear upon server
> shutdown (see the bottom of this message). Three of them are triggered
> by the embedded jbossws.beans in jbossws14.sar, but it seems to be
> caused by the MainDeployer / Bean deployer?
> http://jira.jboss.com/jira/browse/JBAS-3471 (any ideas?)
>
> Apart from that, we have the testsuites to fix and a decision to make.
> We currently run Branch_4_0 under the following JVM combinations with
> the corresponding results.
>
> 1) Sun JVM 1.4 --> 6 failures
> 2) Sun JVM 5   --> 10 failures
> 3) Jrockit 1.4 --> 58 failures
> 4) Jrockit 5   --> 63 failures
>
> Traditionally we only care about the Sun JVM 1.4 test runs. Does this
> still hold true, or if not, how far to go with the other JVM
> combinations? Looking into the failures, I don't think we can reach 100%
> on all of them within the limits of this CR release, so I'd suggest we
> target 100% on (1) and schedule JIRA tasks for addressing the other
> failures in future releases.
>
> Also note, that many of the failures are transient.
>
> Finally, somebody needs to look into the 28 ejb3 testsuite failures.
>
> Please take a look at the remaining tasks, or even if not assigned have
> a go with the remanining testsuite failures
> http://jira.jboss.com/jira/secure/IssueNavigator.jspa?reset=true&mode=hi
> de&sorter/order=DESC&sorter/field=priority&resolution=-1&pid=10030&fixfo
> r=12310576
>
> Thanks
> /Dimitris
>
>
>   




More information about the jboss-development mailing list