[jboss-dev] One Week Until CR1 Component Freeze!
Brian Stansberry
brian.stansberry at redhat.com
Mon Apr 13 12:23:13 EDT 2009
Jason T. Greene wrote:
> We still have 11 updates, and only one week is left until freeze. We
> also only have a week for catching regressions, so we should avoid
> including anything at the last minute. Therefore, let me know if any of
> these should *not* be moved to 5.1.0.GA (except for jboss-managed, which
> has to be included), and if so, when they will be included.
>
> https://jira.jboss.org/jira/browse/JBAS-6552
>
> JBAS-6691 Upgrade JGroups to 2.6.10 Brian Stansberry
I'll move this.
> JBAS-6661 Upgrade Web Beans to 1.0.0.PREVIEW Pete Muir
> JBAS-6636 Upgrade JBoss Cache to 3.1.0.GA Brian Stansberry
Leave this for CR1. We need to validate one issue, which likely isn't a
JBC problem. Then the 3.1.0.CR1 that's been running in Branch_5_x/trunk
for a couple weeks now just needs to be released as GA.
> JBAS-6635 Upgrade JAXB to 2.1.9.patch Shelly McGowan
> JBAS-6634 Upgrade JBossWS Native to 3.1.1.GA Alessio Soldano
> JBAS-6633 Upgrade jboss-ha-server to 1.2.0.GA Paul Ferraro
We'll get this done this week. It's become a 1.1.1.GA with just one bug fix.
> JBAS-6621 Update jboss-managed to 2.1.0.GA Scott M Stark
> JBAS-6564 Include JBoss Negotiation 2.0.3.SP1 Darran Lofthouse
> JBAS-6364 Upgrade apache-beanutils to 1.8.0 David Walluck
> JBAS-6052 Upgrade jboss-profiler-jvmti to final Clebert Suconic
> JBAS-6652 Upgrade AOP to 2.1.0.GA Kabir Khan
>
>
--
Brian Stansberry
Lead, AS Clustering
JBoss, a division of Red Hat
brian.stansberry at redhat.com
More information about the jboss-development
mailing list