[jboss-dev] Update to jboss-cl-2.2.x stable release

Thomas Diesler thomas.diesler at jboss.com
Wed Jan 27 05:41:35 EST 2010


OSGi is functionality that is currently not shipped as part of the AS.

Here is the issue that covers this
https://jira.jboss.org/jira/browse/JBAS-7661

To get an idea about the level of coverage I do, have a look at
http://jbmuc.dyndns.org/jboss-osgi/userguide/html/ChapGettingStarted.html#SecHudson


cheers
-thomas


On 01/26/2010 07:35 PM, Brian Stansberry wrote:
> This tells me we have a pretty major hole in our integration testing.
> For major functionality there should be at least some smoke tests in the
> AS testsuite to validate that the integration works.
>
> https://jira.jboss.org/jira/browse/JBAS-7657
>
> On 01/26/2010 03:24 AM, Thomas Diesler wrote:
>    
>> This means, that M2 would be the first AS release since the interception
>> of JBoss OSGi in Mar-2009 that will NOT have support for our own JBossMC
>> based OSGi Core Framework.
>>
>> Which would not be in line with what Mark says here:
>>
>> http://www.serverwatch.com/news/article.php/3860401/Red-Hats-JBoss-Aims-to-Improve-User-Productivity-UI-in-2010.htm
>>
>>      "We can support OSGi bundles running alongside our native equivalent
>>      format," Little said.
>>
>> Instead, I'd suggest we do the necessary jboss-cl update and the QA
>> associated with it.
>> In case jboss-cl 2.2.x is not in a state where it can be released and
>> brought into AS, I could also try to merge the necessary changes back to
>> the 2.0.8 code base
>> and we include the resulting 2.0.8.SP1 release.
>>
>> Whatever the direction is, I believe an update is necessary (i.e.
>> JBAS-7650 is not optional). If you want to go the 2.0.8 route, please
>> let me know and I can do the necessary merges and possibly the SP1
>> release if Adrian is not available.
>>
>> cheers
>> -thomas
>>
>>
>> On 01/25/2010 05:32 PM, Brian Stansberry wrote:
>>      
>>> There'd have to be a release first; looking at the task list[1] it seems
>>> we're a ways away from an 2.2.0.Alpha.
>>>
>>> The integration cutoff for M2 is Jan 31, and for something as
>>> fundamental as this it would really have to be done (including full AS
>>> testsuite runs done before commit showing no regressions) by tomorrow. I
>>> don't think that's likely, so IMO this is an M3 upgrade.
>>>
>>> [1]
>>> https://jira.jboss.org/jira/secure/IssueNavigator.jspa?reset=true&mode=hide&sorter/order=DESC&sorter/field=priority&resolution=-1&pid=12310570&fixfor=12313375
>>>
>>> On 01/25/2010 01:54 AM, Thomas Diesler wrote:
>>>
>>>        
>>>> Hi Folks,
>>>>
>>>> https://jira.jboss.org/jira/browse/JBAS-7650
>>>>
>>>> is there an update of jboss-cl planned in the future? What's preventing
>>>> AS from using jboss-cl 2.2.x?
>>>>
>>>> cheers
>>>> -thomas
>>>>
>>>> xxxxxxxxxxxxxxxxxxxxxxxxxxxx
>>>> Thomas Diesler
>>>> JBoss OSGi Lead
>>>> JBoss, a division of Red Hat
>>>> xxxxxxxxxxxxxxxxxxxxxxxxxxxx
>>>>
>>>> _______________________________________________
>>>> jboss-development mailing list
>>>> jboss-development at lists.jboss.org
>>>> https://lists.jboss.org/mailman/listinfo/jboss-development
>>>>
>>>>          
>>>
>>>        
>> --
>> xxxxxxxxxxxxxxxxxxxxxxxxxxxx
>> Thomas Diesler
>> JBoss OSGi Lead
>> JBoss, a division of Red Hat
>> xxxxxxxxxxxxxxxxxxxxxxxxxxxx
>>
>>      
>
>    

-- 
xxxxxxxxxxxxxxxxxxxxxxxxxxxx
Thomas Diesler
JBoss OSGi Lead
JBoss, a division of Red Hat
xxxxxxxxxxxxxxxxxxxxxxxxxxxx