[jboss-jira] [JBoss JIRA] Created: (JGRP-350) Regular leave fails after merge

Bela Ban (JIRA) jira-events at jboss.com
Mon Oct 30 04:41:41 EST 2006


Regular leave fails after merge
-------------------------------

                 Key: JGRP-350
                 URL: http://jira.jboss.com/jira/browse/JGRP-350
             Project: JGroups
          Issue Type: Bug
    Affects Versions: 2.3 SP1
            Reporter: Bela Ban
         Assigned To: Bela Ban
             Fix For: 2.4


To reproduce (this is test 20 in ManualTests.txt):
- Nodes A and B connected to a switch
- Kill the switch (or pull the plugs on all nodes)
- Power up the switch (or reinsert the plugs)
- After the merge:
  - Leave the new coordinator (A)
  - The leave should immediately install a new view, this is not the case

REASON:
- The AckCollector's reset() method does *not* clear the suspect set
- The AckCollector does therefore *not* wait for the ack from the new member, and because the coord leaves immediately after sending the new VIEW out, the new VIEW might not be received by B

-- 
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: http://jira.jboss.com/jira/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira

        



More information about the jboss-jira mailing list