[jboss-jira] [JBoss JIRA] Closed: (JBCACHE-956) Use LockParentForChildInsertRemove flag to control Optimistic node versioning
Manik Surtani (JIRA)
jira-events at lists.jboss.org
Tue Apr 17 12:36:30 EDT 2007
[ http://jira.jboss.com/jira/browse/JBCACHE-956?page=all ]
Manik Surtani closed JBCACHE-956.
---------------------------------
Fix Version/s: 1.4.1.SP3
Resolution: Done
This is fixed in 1.4.1.SP3
> Use LockParentForChildInsertRemove flag to control Optimistic node versioning
> -----------------------------------------------------------------------------
>
> Key: JBCACHE-956
> URL: http://jira.jboss.com/jira/browse/JBCACHE-956
> Project: JBoss Cache
> Issue Type: Feature Request
> Security Level: Public(Everyone can see)
> Affects Versions: 1.4.1.GA
> Reporter: Brian Stansberry
> Assigned To: Manik Surtani
> Fix For: 2.0.0.GA, 1.4.1.SP3, 2.0.0.BETA2
>
>
> See JBCACHE-955 for background on locking issues related to inserting and removing child nodes.
> This JIRA is to look into using JBCACHE-955's LockParentForChildInsertRemove flag to control whether the insertion or removal of a child node affects a workspace node's data version.
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: http://jira.jboss.com/jira/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the jboss-jira
mailing list