[jboss-jira] [JBoss JIRA] Assigned: (JBRULES-1063) Failing location determination tests
Philippe Ombredanne (JIRA)
jira-events at lists.jboss.org
Thu Aug 23 15:59:18 EDT 2007
[ http://jira.jboss.com/jira/browse/JBRULES-1063?page=all ]
Philippe Ombredanne reassigned JBRULES-1063:
--------------------------------------------
Assignee: Kris Verlaenen (was: Edson Tirelli)
Kris:
Could you review this?
I just would like you to review the two test quickly (the FAILING ones are the original ones) : http://fisheye.jboss.com/browse/JBossRules/trunk/drools-eclipse/drools-eclipse-test/src/test/java/org/drools/eclipse/editors/completion/CompletionContextTest.java?r=14055#l212
and here :
http://fisheye.jboss.com/browse/JBossRules/trunk/drools-eclipse/drools-eclipse-test/src/test/java/org/drools/eclipse/editors/completion/CompletionContextTest.java?r=14055#l1736
Th is about a change in whitespace handling that was introduced in eth paers.
I am not sure what are the implications for that.
I copied the 2 tests that failed, and made them pass (not whitespace at the end of the line) and kept the ones that failed prefixed with FAILING
> Failing location determination tests
> ------------------------------------
>
> Key: JBRULES-1063
> URL: http://jira.jboss.com/jira/browse/JBRULES-1063
> Project: JBoss Rules
> Issue Type: Bug
> Security Level: Public(Everyone can see)
> Components: Eclipse IDE, Drl Parser/Builder
> Affects Versions: 4.0.1
> Reporter: Philippe Ombredanne
> Assigned To: Kris Verlaenen
> Priority: Minor
> Fix For: 4.0.1
>
>
> We have four failing tests in that code : org.drools.eclipse.editors.completion.CompletionContextTest ( http://fisheye.jboss.com/browse/JBossRules/trunk/drools-eclipse/drools-eclipse-test/src/test/java/org/drools/eclipse/editors/completion/CompletionContextTest.java?r=14038 ) that I isolated in separate test methods, and prefixed so they would not make the build fail.
> Their name is prefixed with FAILING
> I am not sure why they started to fail (I know why, but I do not understand exactly the rationale for the tests being made) , but possibly some changes in the DrlParser handling of trailing white spaces could have triggered that.
> The white space issue could be coming from that rev : http://fisheye.jboss.com/changelog/JBossRules/trunk/drools-compiler/src/main/resources/org/drools?cs=13943
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: http://jira.jboss.com/jira/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the jboss-jira
mailing list