[jboss-jira] [JBoss JIRA] Closed: (JBAS-5091) BuddyCommunicationTimeout is too low

Brian Stansberry (JIRA) jira-events at lists.jboss.org
Mon Dec 24 17:32:43 EST 2007


     [ http://jira.jboss.com/jira/browse/JBAS-5091?page=all ]

Brian Stansberry closed JBAS-5091.
----------------------------------

    Resolution: Done

> BuddyCommunicationTimeout is too low
> ------------------------------------
>
>                 Key: JBAS-5091
>                 URL: http://jira.jboss.com/jira/browse/JBAS-5091
>             Project: JBoss Application Server
>          Issue Type: Bug
>      Security Level: Public(Everyone can see) 
>          Components: Web (Tomcat) service, Clustering, EJB3
>    Affects Versions:  JBossAS-5.0.0.Beta3, JBossAS-4.2.2.GA
>            Reporter: Brian Stansberry
>         Assigned To: Brian Stansberry
>             Fix For: JBossAS-5.0.0.CR1, JBossAS-4.2.3.GA
>
>
> The buddy communication timeout setting in jbossweb-cluster-beans.xml and ejb3-clustered-sfsbcache-beans.xml (as well as jbossweb-cluster.sar/META-INF/jboss-service.xml in the 4.x branches) is only 2 seconds.  This value controls how long a node will wait for data gravitation responses, so 2 seconds is too low.  Under load, data gravitation responses may not arrive within 2 seconds. Value should be made the same as SyncReplTimeout; more like 20 seconds.

-- 
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: http://jira.jboss.com/jira/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira

        



More information about the jboss-jira mailing list