[jboss-jira] [JBoss JIRA] Updated: (JBPM-412) have process start accept a map of variables
Ronald van Kuijk (JIRA)
jira-events at jboss.com
Sat Jan 13 14:26:58 EST 2007
[ http://jira.jboss.com/jira/browse/JBPM-412?page=all ]
Ronald van Kuijk updated JBPM-412:
----------------------------------
Fix Version/s: jBPM 3.3
(was: jBPM 3.2)
Slipping, due to build changes, code changes and the lack of time to keep up. Both should have stabilzed after 3.2 so 3.3 is a more realistic timeline
> have process start accept a map of variables
> --------------------------------------------
>
> Key: JBPM-412
> URL: http://jira.jboss.com/jira/browse/JBPM-412
> Project: JBoss jBPM
> Issue Type: Feature Request
> Components: Core Engine
> Affects Versions: jBPM 3.0.1
> Reporter: Ronald van Kuijk
> Assigned To: Ronald van Kuijk
> Priority: Minor
> Fix For: jBPM 3.3
>
> Original Estimate: 2 hours
> Remaining Estimate: 2 hours
>
> The processstart api has no option of accepting variables. This way you cannot use them in the process-start event. This fires when it is started, before you can set any variables. Be passing e.g. a map of variables to the process start this becomes possible.
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: http://jira.jboss.com/jira/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the jboss-jira
mailing list