[jboss-jira] [JBoss JIRA] Created: (BPEL-269) enhance assignment logging capabilities
Alejandro Guizar (JIRA)
jira-events at lists.jboss.org
Sun Jul 22 00:59:48 EDT 2007
enhance assignment logging capabilities
---------------------------------------
Key: BPEL-269
URL: http://jira.jboss.com/jira/browse/BPEL-269
Project: JBoss jBPM BPEL
Issue Type: Feature Request
Security Level: Public (Everyone can see)
Components: Engine
Affects Versions: jBPM BPEL 1.1 beta 3
Reporter: Alejandro Guizar
Assigned To: Alejandro Guizar
Fix For: jBPM BPEL 1.1 GA
PROBLEM When a bpel:uninitializedVariable fault is thrown, it does not log which variable was uninitialized. Further, logging of extraction and assignment of values is generally scarce.
SOLUTION Log the uninitialized variables. Add extraction/assignment logs to all from/to variants.
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: http://jira.jboss.com/jira/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the jboss-jira
mailing list