[jboss-jira] [JBoss JIRA] Commented: (JBAS-2235) Server Controller Tasks: Throw error if normal shutdown fails
Dimitris Andreadis (JIRA)
jira-events at lists.jboss.org
Tue Nov 13 12:14:18 EST 2007
[ http://jira.jboss.com/jira/browse/JBAS-2235?page=comments#action_12387340 ]
Dimitris Andreadis commented on JBAS-2235:
------------------------------------------
Let me recap my take:
1) I want the build to continue. When the whole testsuite takes 4+ hours to complete I don't want a small mistake in one custom configuration to ruin all the results. Now if we can somehow highlight that we have a server start/stop problem, that would be nice.
2) Adrian's idea should be tried out.
- try a normal shutdown (with a timeout)
- try a -H shutdown (force the JVM to halt)
- kill the process
> Server Controller Tasks: Throw error if normal shutdown fails
> -------------------------------------------------------------
>
> Key: JBAS-2235
> URL: http://jira.jboss.com/jira/browse/JBAS-2235
> Project: JBoss Application Server
> Issue Type: Feature Request
> Security Level: Public(Everyone can see)
> Components: Test Suite
> Environment: jboss-4.0 tip
> Reporter: Ryan Campbell
> Assigned To: Martin Vecera
> Fix For: JBossAS-5.0.0.Beta3
>
>
> Currently, when a server fails to respond to a shutdown request, the process is killed and the tests continue.
> There should be an error thrown if the server fails to shutdown within the timeout period.
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: http://jira.jboss.com/jira/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the jboss-jira
mailing list