[jboss-jira] [JBoss JIRA] Reopened: (JGRP-624) connect-with-state-transfer not working when multiple clients simultaneously try to connect-with-state-transfer

Michael Newcomb (JIRA) jira-events at lists.jboss.org
Mon Nov 19 10:15:24 EST 2007


     [ http://jira.jboss.com/jira/browse/JGRP-624?page=all ]

Michael Newcomb reopened JGRP-624:
----------------------------------

             
Actually, the heading is still correct, so going to re-open this issue.

> connect-with-state-transfer not working when multiple clients simultaneously try to connect-with-state-transfer
> ---------------------------------------------------------------------------------------------------------------
>
>                 Key: JGRP-624
>                 URL: http://jira.jboss.com/jira/browse/JGRP-624
>             Project: JGroups
>          Issue Type: Bug
>    Affects Versions: 2.6
>            Reporter: Michael Newcomb
>         Assigned To: Vladimir Blagojevic
>             Fix For: 2.7, 2.6.1
>
>
> 1. have 2 members of a group connected
> 2. simultaneously launch 3 new members that connect with a state transfer request
> 3. each of the 3 new members eventually time out awaiting state transfer
> I was watching the log on the initially connected members (1 coordinator and 1 member) and I watched as each of the new members slowly joined (about 10s between each new view). However, on the coordinator log, I saw some GMS 'flush failure' messages.
> I will be re-running with all the logs on and will report back.

-- 
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: http://jira.jboss.com/jira/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira

        



More information about the jboss-jira mailing list