[jboss-jira] [JBoss JIRA] Created: (EJBTHREE-1260) Performance issue with EjbLinkDemandMetaData

Guy Coleman (JIRA) jira-events at lists.jboss.org
Fri Apr 11 09:44:01 EDT 2008


Performance issue with EjbLinkDemandMetaData
--------------------------------------------

                 Key: EJBTHREE-1260
                 URL: http://jira.jboss.com/jira/browse/EJBTHREE-1260
             Project: EJB 3.0
          Issue Type: Bug
          Components: core
    Affects Versions: AS 5.0.0.Beta4
            Reporter: Guy Coleman


We have an application with about 200 EJB3 SLSB and MDBs, 120 EJB2 entity beans and a few web apps.

This takes about 1-2 minutes to start up with JBoss 4.2.2.GA. With 5.0.0.Beta4 this jumps to around 20-30 minutes. Some thread dumps show that it's spending most of its time here:

"main" prio=6 tid=0x044b7430 nid=0x10b4 runnable [0x049cd000..0x049cf9f8]
        at java.lang.Throwable.fillInStackTrace(Native Method)
        at java.lang.Throwable.<init>(Throwable.java:196)
        at java.lang.Exception.<init>(Exception.java:41)
        at javax.management.JMException.<init>(JMException.java:35)
        at javax.management.OperationsException.<init>(OperationsException.java:36)
        at javax.management.MalformedObjectNameException.<init>(MalformedObjectNameException.java:35)
        at javax.management.ObjectName.construct(ObjectName.java:393)
        at javax.management.ObjectName.<init>(ObjectName.java:1304)
        at org.jboss.ejb3.dependency.EjbLinkDemandMetaData$EjbLinkDemandDependencyItem.resolve(EjbLinkDemandMetaData.java:134)
        at org.jboss.dependency.plugins.AbstractDependencyInfo.resolveDependencies(AbstractDependencyInfo.java:140)
        at org.jboss.dependency.plugins.AbstractController.resolveContexts(AbstractController.java:901)
        at org.jboss.dependency.plugins.AbstractController.resolveContexts(AbstractController.java:839)
        at org.jboss.dependency.plugins.AbstractController.resolveContexts(AbstractController.java:784)
        at org.jboss.dependency.plugins.AbstractController.change(AbstractController.java:622)
        at org.jboss.dependency.plugins.AbstractController.change(AbstractController.java:411)
        at org.jboss.system.ServiceController.doChange(ServiceController.java:659)
        at org.jboss.system.ServiceController.create(ServiceController.java:393)
        at org.jboss.system.ServiceController.create(ServiceController.java:358)
        at sun.reflect.GeneratedMethodAccessor212.invoke(Unknown Source)
        at sun.reflect.DelegatingMethodAccessorImpl.invoke(DelegatingMethodAccessorImpl.java:25)
        at java.lang.reflect.Method.invoke(Method.java:585)
        at org.jboss.mx.interceptor.ReflectedDispatcher.invoke(ReflectedDispatcher.java:157)
        at org.jboss.mx.server.Invocation.dispatch(Invocation.java:96)
        at org.jboss.mx.server.Invocation.invoke(Invocation.java:88)
        at org.jboss.mx.server.AbstractMBeanInvoker.invoke(AbstractMBeanInvoker.java:264)
        at org.jboss.mx.server.MBeanServerImpl.invoke(MBeanServerImpl.java:668)
        at org.jboss.system.ServiceMBeanSupport.create(ServiceMBeanSupport.java:186)

Patching EjbLinkDemandMetaData to avoid creating ObjectNames for names that are obviously invalid speed this up considerably: the startup time is then about 5 minutes, though It still seems to spend a lot of time looping in that EjbLinkDemandDependencyItem .resolve

-- 
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: http://jira.jboss.com/jira/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira

        



More information about the jboss-jira mailing list