[jboss-jira] [JBoss JIRA] Assigned: (JBAS-5596) Upgrade jboss-integration to 5.0.0.CR2
Dimitris Andreadis (JIRA)
jira-events at lists.jboss.org
Wed Aug 6 05:45:57 EDT 2008
[ https://jira.jboss.org/jira/browse/JBAS-5596?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Dimitris Andreadis reassigned JBAS-5596:
----------------------------------------
Assignee: Paul Gier
Paul, can you produce this release for us?
> Upgrade jboss-integration to 5.0.0.CR2
> --------------------------------------
>
> Key: JBAS-5596
> URL: https://jira.jboss.org/jira/browse/JBAS-5596
> Project: JBoss Application Server
> Issue Type: Sub-task
> Security Level: Public(Everyone can see)
> Components: Other
> Reporter: Dimitris Andreadis
> Assignee: Paul Gier
> Fix For: JBossAS-5.0.0.CR2
>
>
> We are currently at a jboss-integration 5.0.0.Beta.
> Upgrade jboss-integration to 5.0.0.CR2, because the CR1 release made at some point was in error. Although it was removed by the repository and the tag was deleted it could have been cached by some local maven repo.
> So produce a 5.0.0.CR2 version instead.
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: https://jira.jboss.org/jira/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the jboss-jira
mailing list