[jboss-jira] [JBoss JIRA] Commented: (JBAS-5703) Make HA-JNDI use wait for first positive response
Brian Stansberry (JIRA)
jira-events at lists.jboss.org
Fri Aug 29 18:31:02 EDT 2008
[ https://jira.jboss.org/jira/browse/JBAS-5703?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=12427423#action_12427423 ]
Brian Stansberry commented on JBAS-5703:
----------------------------------------
Note that JBAS-5913 has resulted in a fairly big change in where things are done in HA-JNDI code. The TreeHead class no longer exists. The group RPC for cluster-wide lookups is now in the HAJNDI class, method lookupRemotely. That method is basically an extraction of the previous logic from TreeHead.
> Make HA-JNDI use wait for first positive response
> -------------------------------------------------
>
> Key: JBAS-5703
> URL: https://jira.jboss.org/jira/browse/JBAS-5703
> Project: JBoss Application Server
> Issue Type: Sub-task
> Security Level: Public(Everyone can see)
> Components: Clustering, Naming
> Reporter: Galder Zamarreno
> Assignee: Galder Zamarreno
> Fix For: JBossAS-5.0.0.CR2
>
>
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: https://jira.jboss.org/jira/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the jboss-jira
mailing list