[jboss-jira] [JBoss JIRA] Updated: (JBAS-6079) Upgrade JBoss Cache to 3.0.0.GA

Brian Stansberry (JIRA) jira-events at lists.jboss.org
Mon Nov 3 16:05:21 EST 2008


     [ https://jira.jboss.org/jira/browse/JBAS-6079?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Brian Stansberry updated JBAS-6079:
-----------------------------------

    Attachment: AS-toJBC3.patch


Attaching patch with changes needed to allow AS 5 to compile properly with JBoss Cache 3.

Patch does not include the change to component-info/pom.xml needed to use JBoss Cache 3 and PojoCache 3.  Will post a follow-up comment shortly showing that once Jason advises what the name of the PojoCache release will be.

> Upgrade JBoss Cache to 3.0.0.GA
> -------------------------------
>
>                 Key: JBAS-6079
>                 URL: https://jira.jboss.org/jira/browse/JBAS-6079
>             Project: JBoss Application Server
>          Issue Type: Component Upgrade
>      Security Level: Public(Everyone can see) 
>            Reporter: Brian Stansberry
>            Assignee: Brian Stansberry
>             Fix For: JBossAS-5.0.0.GA
>
>         Attachments: AS-toJBC3.patch
>
>
> To pick up fix for JBCACHE-1423.

-- 
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: https://jira.jboss.org/jira/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira

        



More information about the jboss-jira mailing list