[jboss-jira] [JBoss JIRA] Updated: (GPD-305) GPD diagram are not in sync with text.
Koen Aers (JIRA)
jira-events at lists.jboss.org
Tue Nov 10 15:00:05 EST 2009
[ https://jira.jboss.org/jira/browse/GPD-305?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Koen Aers updated GPD-305:
--------------------------
Fix Version/s: jBPM jPDL Designer 3.x
> GPD diagram are not in sync with text.
> --------------------------------------
>
> Key: GPD-305
> URL: https://jira.jboss.org/jira/browse/GPD-305
> Project: jBPM GPD
> Issue Type: Bug
> Components: jpdl
> Affects Versions: jBPM jPDL Designer 3.1.6, jBPM jPDL Designer 3.1.7
> Reporter: Andrey Sobolev
> Assignee: Koen Aers
> Fix For: jBPM jPDL Designer 3.x
>
>
> Hi,
> We found a problem then try to use GPD from our product.
> Editor could be not in sync with diagram if eclipse file are changed then editor are opened.
> With following simple scenario problem could be reproduced:
> 1) Create new empty JPDL document.
> Content will be following:
> <?xml version="1.0" encoding="UTF-8"?>
> <process-definition xmlns="" name="test"></process-definition>
> 2)Then open processdefinition.xml file with generic text editor and change content to:
> <?xml version="1.0" encoding="UTF-8"?>
> <process-definition xmlns="" name="test"/>
> 3) After text is saved. Source and diagram are not in sync. So then we add new elements, text are not modified.
> Best regards,
> Andrei.
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: https://jira.jboss.org/jira/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the jboss-jira
mailing list