[jboss-jira] [JBoss JIRA] Resolved: (JBAS-5419) Server Shutdown Latency - Session replication and Forwarding

Brian Stansberry (JIRA) jira-events at lists.jboss.org
Tue Nov 17 07:50:29 EST 2009


     [ https://jira.jboss.org/jira/browse/JBAS-5419?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Brian Stansberry resolved JBAS-5419.
------------------------------------

    Resolution: Incomplete Description


> Server Shutdown Latency - Session replication and Forwarding
> ------------------------------------------------------------
>
>                 Key: JBAS-5419
>                 URL: https://jira.jboss.org/jira/browse/JBAS-5419
>             Project: JBoss Application Server
>          Issue Type: Bug
>      Security Level: Public(Everyone can see) 
>          Components: Clustering
>    Affects Versions: JBossAS-4.0.5.GA
>         Environment: Java 1.5.0_05, Win XP,Red Hat 3 JBoss 4.0.5 Apache
>            Reporter: Sam[Shankar Pattabiraman]
>            Assignee: Brian Stansberry
>            Priority: Minor
>
> Setup a cluster with 2 nodes. Be in a session where a server is servicing. 
> Try to give a Control Z to kill the server while servicing. The latency involved in shutting down the server never gives a chance for the server to switch to the other.
> The session in the latency period of shutdown never gets successfully switched to the other node in the cluster.
> Apache-2 Node Jboss Cluster and a Trivial JEE Application.
> Check this out whether it is a configuration issue or a real issue.

-- 
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: https://jira.jboss.org/jira/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira

        



More information about the jboss-jira mailing list