[jboss-jira] [JBoss JIRA] (JGRP-1401) RELAY: messages lost when relay coordinator crashes

Bela Ban (Created) (JIRA) jira-events at lists.jboss.org
Wed Dec 14 06:48:10 EST 2011


RELAY: messages lost when relay coordinator crashes
---------------------------------------------------

                 Key: JGRP-1401
                 URL: https://issues.jboss.org/browse/JGRP-1401
             Project: JGroups
          Issue Type: Feature Request
            Reporter: Bela Ban
            Assignee: Bela Ban
             Fix For: 3.1


When we have sites {A,B,C} and {X,Y,Z} (with relay coords A and X), during the time X leaves (or crashes) and Y taking over, all messages sent by the first site are not relayed to the second site.
Because the sites are autonomous, there won't be any retransmission of the dropped messages.
This can have an adverse affect, e.g. in Infinispan:
- Say key K is stored on A, B and Z
- Now we're updating K, on A and B, but before the change is relayed to the other site, X crashes
- If there is no rebalancing, e.g. because K is still to be stored on A, B and Z, since the update on Z was dropped, Z has a stale value !

SOLUTION 1:
- Have a backup coordinator B cache the last N messages in memory (with overflow to disk)
- A numbers relayed messages
- As soon as A has relayed message #50, it sends this info to B. Or, alternatively, this could be done periodically, or based on the number of relayed messages (e.g. every 10 messages)
- B can then purge those messages
- When A crashes, B runs a reconciliation protocol with X to determine whether to relay some backed up messages
- C now starts acting as backup relay to B

This solution is probably the simplest to implement, and doesn't require any code changes in Infinispan. However, there is still a chance of message loss if both the relay *and* the backup relay crash at the same time.

SOLUTION 2:
- After a crash (not a graceful leave !) of a relay coordinator, there has to be a full rebalancing of all keys
- This is wasteful though
- May not be needed, perhaps Infinispan could check whether a full rebalancing is required ?


--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.jboss.org/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        


More information about the jboss-jira mailing list