[jboss-jira] [JBoss JIRA] (AS7-3074) Upgrade to temporary releases of Remoting so the SSL changes can be pulled into AS7 master
Darran Lofthouse (Updated) (JIRA)
jira-events at lists.jboss.org
Sat Dec 17 11:10:09 EST 2011
[ https://issues.jboss.org/browse/AS7-3074?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Darran Lofthouse updated AS7-3074:
----------------------------------
Summary: Upgrade to temporary releases of Remoting so the SSL changes can be pulled into AS7 master (was: Upgrade to temporary releases of Remoting an XNIO so the SSL changes can be pulled into AS7 master)
Description:
https://github.com/darranl/jboss-remoting/tree/3.2.0.CR6-darranl-1
was:
https://github.com/darranl/jboss-remoting/tree/3.2.0.CR6-darranl-1
and
https://github.com/fl4via/xnio/commit/b444f11cd19e31ba5d4100f4a2aa347484fbd218
> Upgrade to temporary releases of Remoting so the SSL changes can be pulled into AS7 master
> ------------------------------------------------------------------------------------------
>
> Key: AS7-3074
> URL: https://issues.jboss.org/browse/AS7-3074
> Project: Application Server 7
> Issue Type: Task
> Components: Remoting
> Reporter: Darran Lofthouse
> Assignee: Darran Lofthouse
> Priority: Critical
> Fix For: 7.1.0.CR1
>
>
> https://github.com/darranl/jboss-remoting/tree/3.2.0.CR6-darranl-1
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.jboss.org/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the jboss-jira
mailing list