[jboss-jira] [JBoss JIRA] (AS7-2443) TS: Move smoke and integration tests before the domain stuff.
Ondrej Zizka (Assigned) (JIRA)
jira-events at lists.jboss.org
Mon Oct 31 18:30:45 EDT 2011
[ https://issues.jboss.org/browse/AS7-2443?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Ondrej Zizka reassigned AS7-2443:
---------------------------------
Assignee: Ondrej Zizka
> TS: Move smoke and integration tests before the domain stuff.
> -------------------------------------------------------------
>
> Key: AS7-2443
> URL: https://issues.jboss.org/browse/AS7-2443
> Project: Application Server 7
> Issue Type: Sub-task
> Components: Test Suite
> Reporter: Ondrej Zizka
> Assignee: Ondrej Zizka
> Fix For: 7.1.0.Beta1
>
>
> {query}
> (21:31:55) bstansberry: OndrejZizka1: I'd like to re-order the testsuite execution a bit but am a bit lost on what's driving the current order
> (21:33:11) bstansberry: OndrejZizka1: it would be better if smoke and integration tests ran before the domain stuff, as the domain stuff is slow and just delays an overall failure if one of the more numerous smoke/integration tests fails
> {query}
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.jboss.org/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the jboss-jira
mailing list