[jboss-jira] [JBoss JIRA] (AS7-4192) Shutdown HC/DC result unpredictable

Emanuel Muckenhuber (JIRA) jira-events at lists.jboss.org
Mon Mar 19 04:46:49 EDT 2012


    [ https://issues.jboss.org/browse/AS7-4192?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=12677545#comment-12677545 ] 

Emanuel Muckenhuber commented on AS7-4192:
------------------------------------------

Hmm, do you think there is a chance this error message is caused by the http socket getting closed before the message was sent?
                
> Shutdown HC/DC result unpredictable
> -----------------------------------
>
>                 Key: AS7-4192
>                 URL: https://issues.jboss.org/browse/AS7-4192
>             Project: Application Server 7
>          Issue Type: Bug
>          Components: Domain Management
>    Affects Versions: 7.1.1.Final
>            Reporter: Heiko Rupp
>            Assignee: Brian Stansberry
>              Labels: rhq
>
> Issuing the /host=foo:shutdown operation sometimes returns a success result and sometimes
> Operation <Operation{operation='shutdown', address=Address{path: host=master}, additionalProperties={}}> returned <"Socket closed","rolled-back":false,"response-headers":null,"result":null,"success":false,"throwable":null,"failureDescription":"Socket closed, rolled-back=false","responseHeaders":null,"outcome":"failure","rolledBack":false}>
> This seems to have to do with the timing of the shutdown of the managed servers

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.jboss.org/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        


More information about the jboss-jira mailing list