[jboss-jira] [JBoss JIRA] (JBAS-9530) Deployment takes long time in Solaris 5.10 compare to Linux
jaikiran pai (JIRA)
jira-events at lists.jboss.org
Wed Apr 3 00:31:42 EDT 2013
[ https://issues.jboss.org/browse/JBAS-9530?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=12764588#comment-12764588 ]
jaikiran pai commented on JBAS-9530:
------------------------------------
Community versions JBoss AS5 and JBoss AS6 no longer have any active development going on. That also means that there aren't any bug fixes being planned. Please use the latest AS7/8 versions which are actively being developed.
> Deployment takes long time in Solaris 5.10 compare to Linux
> -----------------------------------------------------------
>
> Key: JBAS-9530
> URL: https://issues.jboss.org/browse/JBAS-9530
> Project: Application Server 3 4 5 and 6
> Issue Type: Enhancement
> Security Level: Public(Everyone can see)
> Components: Deployers
> Affects Versions: JBossAS-5.1.0.GA
> Environment: Solaris Setup :
> ------------------------
> OS
> -------
> SunOS 5.10 Generic_147440-14 sun4v sparc SUNW,Netra-T5220
> RAM - 32 GB
> JAVA Version
> ---------------------
> java version "1.7.0_03"
> Java(TM) SE Runtime Environment (build 1.7.0_03-b04)
> Java HotSpot(TM) Server VM (build 22.1-b02, mixed mode)
> Heap Size - 4GB
> -------------------
> Linux Setup :
> --------------------
> Linux 2.6.32-279.11.1.el6.x86_64
> RAM - 32 GB
> JAVA Version
> java version "1.7.0_09-icedtea"
> OpenJDK Runtime Environment (rhel-2.3.4.1.el6_3-x86_64)
> OpenJDK 64-Bit Server VM (build 23.2-b09, mixed mode)
> Heap Size : 4 GB
> Deployed artifacts are same for Linux and Solaris
> Reporter: Debayan Gupta
> Assignee: Ales Justin
> Attachments: linux.JPG, solaris.JPG
>
>
> In Solaris, JBoss server takes around 8 minutes to start compare to around 2 minutes in Linux.
> After profiling, it was found that "org.jboss.deployers.plugins.deployers.DeployersImpl.doInstallParentFirst" and "org.jboss.deployers.plugins.deployers.DeployersImpl.doDeploy" was taking the most time and in Solaris it is almost 4 times (~624 sec with profiler attached) than the same on Linux (~161 with profiler attached).
>
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the jboss-jira
mailing list