[jboss-jira] [JBoss JIRA] (WFLY-609) TS: Move smoke and integration tests before the domain stuff.
Jason Greene (JIRA)
jira-events at lists.jboss.org
Tue Apr 23 15:45:03 EDT 2013
[ https://issues.jboss.org/browse/WFLY-609?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Jason Greene moved AS7-2443 to WFLY-609:
----------------------------------------
Project: WildFly (was: Application Server 7)
Key: WFLY-609 (was: AS7-2443)
Component/s: (was: Test Suite)
Fix Version/s: (was: 7.1.0.CR1)
> TS: Move smoke and integration tests before the domain stuff.
> -------------------------------------------------------------
>
> Key: WFLY-609
> URL: https://issues.jboss.org/browse/WFLY-609
> Project: WildFly
> Issue Type: Sub-task
> Reporter: Ondrej Zizka
> Assignee: Ondrej Zizka
>
> {query}
> (21:31:55) bstansberry: OndrejZizka1: I'd like to re-order the testsuite execution a bit but am a bit lost on what's driving the current order
> (21:33:11) bstansberry: OndrejZizka1: it would be better if smoke and integration tests ran before the domain stuff, as the domain stuff is slow and just delays an overall failure if one of the more numerous smoke/integration tests fails
> {query}
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the jboss-jira
mailing list