[jboss-jira] [JBoss JIRA] (WFLY-1318) executing a :reload using the http interface fails
RH Bugzilla Integration (JIRA)
issues at jboss.org
Wed Aug 20 11:15:35 EDT 2014
[ https://issues.jboss.org/browse/WFLY-1318?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=12994417#comment-12994417 ]
RH Bugzilla Integration commented on WFLY-1318:
-----------------------------------------------
Emanuel Muckenhuber <emuckenh at redhat.com> changed the Status of [bug 960577|https://bugzilla.redhat.com/show_bug.cgi?id=960577] from ASSIGNED to POST
> executing a :reload using the http interface fails
> --------------------------------------------------
>
> Key: WFLY-1318
> URL: https://issues.jboss.org/browse/WFLY-1318
> Project: WildFly
> Issue Type: Bug
> Security Level: Public(Everyone can see)
> Components: Domain Management
> Reporter: Emanuel Muckenhuber
> Assignee: Emanuel Muckenhuber
> Fix For: 8.0.0.Alpha2
>
>
> When executing a :reload operation using the http interface, the connection might get closed before the response was sent. This is similar to the issues we were seeing with the native mgmt API.
--
This message was sent by Atlassian JIRA
(v6.2.6#6264)
More information about the jboss-jira
mailing list