[jboss-jira] [JBoss JIRA] (WFLY-1318) executing a :reload using the http interface fails

RH Bugzilla Integration (JIRA) issues at jboss.org
Sat Aug 23 05:09:59 EDT 2014


    [ https://issues.jboss.org/browse/WFLY-1318?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=12995241#comment-12995241 ] 

RH Bugzilla Integration commented on WFLY-1318:
-----------------------------------------------

Kabir Khan <kkhan at redhat.com> changed the Status of [bug 960577|https://bugzilla.redhat.com/show_bug.cgi?id=960577] from POST to MODIFIED

> executing a :reload using the http interface fails
> --------------------------------------------------
>
>                 Key: WFLY-1318
>                 URL: https://issues.jboss.org/browse/WFLY-1318
>             Project: WildFly
>          Issue Type: Bug
>      Security Level: Public(Everyone can see) 
>          Components: Domain Management
>            Reporter: Emanuel Muckenhuber
>            Assignee: Emanuel Muckenhuber
>             Fix For: 8.0.0.Alpha2
>
>
> When executing a :reload operation using the http interface, the connection might get closed before the response was sent. This is similar to the issues we were seeing with the native mgmt API.



--
This message was sent by Atlassian JIRA
(v6.3.1#6329)


More information about the jboss-jira mailing list