[jboss-jira] [JBoss JIRA] (WFCORE-408) Add a TRACE level category for the operations used to start a server.
Brian Stansberry (JIRA)
issues at jboss.org
Mon Dec 1 16:32:39 EST 2014
[ https://issues.jboss.org/browse/WFCORE-408?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Brian Stansberry moved WFLY-2256 to WFCORE-408:
-----------------------------------------------
Project: WildFly Core (was: WildFly)
Key: WFCORE-408 (was: WFLY-2256)
Component/s: Domain Management
Logging
(was: Domain Management)
(was: Logging)
Fix Version/s: (was: Awaiting Volunteers)
> Add a TRACE level category for the operations used to start a server.
> ---------------------------------------------------------------------
>
> Key: WFCORE-408
> URL: https://issues.jboss.org/browse/WFCORE-408
> Project: WildFly Core
> Issue Type: Enhancement
> Components: Domain Management, Logging
> Reporter: Darran Lofthouse
>
> Sometimes after being able to start a server from the XML configuration it is useful to be able to identify the actual operations that are executed to start the server.
> From a development perspective this is useful for double checking the operations are as we expect.
> From an end user perspective this can be useful to identify the set of equivalent operations needed if the same was to be achieved in a CLI script.
--
This message was sent by Atlassian JIRA
(v6.3.8#6338)
More information about the jboss-jira
mailing list