[jboss-jira] [JBoss JIRA] (WFLY-2956) Port version 1.6 of the management schema upstream.
Darran Lofthouse (JIRA)
issues at jboss.org
Mon Jul 28 07:31:29 EDT 2014
[ https://issues.jboss.org/browse/WFLY-2956?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Darran Lofthouse updated WFLY-2956:
-----------------------------------
Parent: (was: WFLY-2990)
Issue Type: Task (was: Sub-task)
> Port version 1.6 of the management schema upstream.
> ---------------------------------------------------
>
> Key: WFLY-2956
> URL: https://issues.jboss.org/browse/WFLY-2956
> Project: WildFly
> Issue Type: Task
> Security Level: Public(Everyone can see)
> Components: Domain Management
> Reporter: Darran Lofthouse
> Assignee: Darran Lofthouse
> Priority: Critical
> Fix For: 9.0.0.CR1
>
>
> EAP will be introducing version 1.6 of the management schema, this needs porting upstream.
> At the same point the coding convention we have adopted has been based around a linear progression of the configuration schemas, when version 1.5 was ported this still worked as 1.5 contained a subset of the changes that went into 2.0.
> 1.6 is going to be a special case as it will build on 1.5 so is already a subset of 2.0 but will also only contain a subset of changes that go into 3.0 - the risk however is our switch statements are built around dropping into a default block that is hit for all schema versions not explicitly listed.
--
This message was sent by Atlassian JIRA
(v6.2.6#6264)
More information about the jboss-jira
mailing list