[jboss-jira] [JBoss JIRA] (WFLY-3503) EJB method takes more time to return after each call

Cesar Tron-Lozai (JIRA) issues at jboss.org
Mon Jun 16 11:19:24 EDT 2014


Cesar Tron-Lozai created WFLY-3503:
--------------------------------------

             Summary: EJB method takes more time to return after each call
                 Key: WFLY-3503
                 URL: https://issues.jboss.org/browse/WFLY-3503
             Project: WildFly
          Issue Type: Bug
      Security Level: Public (Everyone can see)
          Components: EJB
    Affects Versions: JBoss AS7 7.2.0.Final
         Environment: windows 7
            Reporter: Cesar Tron-Lozai
            Assignee: David Lloyd


I had this issue with JBoss EAP 6.1

I have a method that loops for an arbitrary number of times and makes call to a simple get method from an stateless bean. Everytime the methods gets called, it takes more and more time to complete.

Please look at the link on Stackoverflow for more details and code snipets



--
This message was sent by Atlassian JIRA
(v6.2.6#6264)


More information about the jboss-jira mailing list