[jboss-jira] [JBoss JIRA] (WFLY-5220) Tests in testsuite/integration/basic runs more time when -Dtest maven argument is used
Josef Cacek (JIRA)
issues at jboss.org
Thu Aug 27 06:45:44 EDT 2015
[ https://issues.jboss.org/browse/WFLY-5220?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Josef Cacek updated WFLY-5220:
------------------------------
Description: Multiple maven-surefire-plugin executions are started when {{-Dtest}} maven switch is used in {{testsuite/integration/basic}}. (was: More maven-surefire-plugin executions is used when {{-Dtest}} maven switch is present in {{testsuite/integration/basic}}.)
> Tests in testsuite/integration/basic runs more time when -Dtest maven argument is used
> --------------------------------------------------------------------------------------
>
> Key: WFLY-5220
> URL: https://issues.jboss.org/browse/WFLY-5220
> Project: WildFly
> Issue Type: Bug
> Components: Test Suite
> Affects Versions: 10.0.0.Beta2
> Reporter: Josef Cacek
> Assignee: Josef Cacek
>
> Multiple maven-surefire-plugin executions are started when {{-Dtest}} maven switch is used in {{testsuite/integration/basic}}.
--
This message was sent by Atlassian JIRA
(v6.3.15#6346)
More information about the jboss-jira
mailing list