[jboss-jira] [JBoss JIRA] (DROOLS-188) Link nodeId (from process definition) to WorkItem
Kris Verlaenen (JIRA)
issues at jboss.org
Thu Jul 23 08:46:05 EDT 2015
[ https://issues.jboss.org/browse/DROOLS-188?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Kris Verlaenen resolved DROOLS-188.
-----------------------------------
Fix Version/s: 6.1.0.Final
Resolution: Done
Marking as resolved as the linked JBPM JIRA is already resolved.
> Link nodeId (from process definition) to WorkItem
> -------------------------------------------------
>
> Key: DROOLS-188
> URL: https://issues.jboss.org/browse/DROOLS-188
> Project: Drools
> Issue Type: Feature Request
> Affects Versions: 5.5.0.Final, 6.0.0.CR1
> Reporter: Alan Gairey
> Assignee: Kris Verlaenen
> Fix For: 6.1.0.Final
>
> Attachments: drools-core-5.5.0.Final-changes.zip, drools-core-trunk-changes.zip, kie-api-trunk-changes.zip, knowledge-api-5.5.0.Final-changes.zip, knowledge-api-legacy5-adapter-trunk-changes.zip
>
>
> This issue links to JBPM-3232.
> I would like the node ID, from the process definition file (i.e. .bpmn or .rf file), to be a field of a WorkItem. This requires changes to *knowledge-api* and *drools-core* as well as the jBPM code base.
> It's useful to know, when handling a WorkItem in a WorkItemHandler, which node from the process definition is being run (particularly if the same task type is used multiple times in the workflow).
> I've attached the required changes, both for the 5.5.0.Final code, and also the latest trunk.
--
This message was sent by Atlassian JIRA
(v6.3.15#6346)
More information about the jboss-jira
mailing list