[jboss-jira] [JBoss JIRA] (WFLY-5641) Cleanup is not done properly after test have finished

Ivan Straka (JIRA) issues at jboss.org
Fri Nov 6 06:40:00 EST 2015


Ivan Straka created WFLY-5641:
---------------------------------

             Summary: Cleanup is not done properly after test have finished
                 Key: WFLY-5641
                 URL: https://issues.jboss.org/browse/WFLY-5641
             Project: WildFly
          Issue Type: Bug
          Components: Clustering, Test Suite
            Reporter: Ivan Straka
            Assignee: Paul Ferraro
            Priority: Minor


There are several tests failing because cleanup process was not done properly.
This can be caused by ibmjdk1.8 that do not run test in different order. Therefore problem is shown.

two exceptions:

 https://jenkins.mw.lab.eng.bos.redhat.com/hudson/job/eap-7x-tcpgossip-maven-rhel/lastCompletedBuild/jdk=ibm1.8,label_exp=EAP-RHEL7%20&&%20eap-sustaining/testReport/org.jboss.as.test.clustering.extended.ejb2.stateful.remote.failover/RemoteEJBClientStatefulBeanFailoverTestCase%28SYNC-tcp-extended%29/testFailoverFromRemoteClientWhenOneNodeGoesDown/

https://jenkins.mw.lab.eng.bos.redhat.com/hudson/job/eap-7x-tcpgossip-maven-rhel/lastCompletedBuild/jdk=ibm1.8,label_exp=EAP-RHEL7%20&&%20eap-sustaining/testReport/org.jboss.as.test.clustering.extended.ejb2.stateless/RemoteStatelessFailoverTestCase%28SYNC-tcp-extended%29/testFailoverOnUndeploySpecifiedByDescriptor/

whole run:
https://jenkins.mw.lab.eng.bos.redhat.com/hudson/job/eap-7x-tcpgossip-maven-rhel/3/testReport/



--
This message was sent by Atlassian JIRA
(v6.4.11#64026)


More information about the jboss-jira mailing list