[jboss-jira] [JBoss JIRA] (WFLY-5681) start process of WildFly-8.2.0-Final never finish (Starting, Synchronized)
carl zhang (JIRA)
issues at jboss.org
Fri Nov 13 16:07:00 EST 2015
carl zhang created WFLY-5681:
--------------------------------
Summary: start process of WildFly-8.2.0-Final never finish (Starting, Synchronized)
Key: WFLY-5681
URL: https://issues.jboss.org/browse/WFLY-5681
Project: WildFly
Issue Type: Bug
Components: IDE
Affects Versions: 8.2.0.Final
Environment: start process of WildFly-8.2.0-Final never finish (Starting, Synchronized)
Reporter: carl zhang
Assignee: Jason Greene
please refer to
https://developer.jboss.org/thread/265726?start=0&tstart=0
refer to the picture of 28-Oct-2015 9:46 AM (layer 3)
In the left panel: WildFly 8.x is configured to connect to localhost
WildFly 8.x(1) is configured to connect to remote host (Linux)
The localhost cannot finish start process. WildFly 8.x(1) (remote) can.
What ports, or temp files, or anything else are checked when changing from starting to started state?
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)
More information about the jboss-jira
mailing list