[jboss-jira] [JBoss JIRA] (WFCORE-1370) All configuration changes have the same operation date
ehsavoie Hugonnet (JIRA)
issues at jboss.org
Mon Feb 15 04:00:01 EST 2016
ehsavoie Hugonnet created WFCORE-1370:
-----------------------------------------
Summary: All configuration changes have the same operation date
Key: WFCORE-1370
URL: https://issues.jboss.org/browse/WFCORE-1370
Project: WildFly Core
Issue Type: Bug
Components: Domain Management
Affects Versions: 2.1.0.CR1
Reporter: ehsavoie Hugonnet
Assignee: ehsavoie Hugonnet
When I list the changes, the operation date for all of the changes are the same, and seem to be the date/time when the `list-changes` operation is performed. I tried this just now with ER5:
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)
More information about the jboss-jira
mailing list