[jboss-jira] [JBoss JIRA] (WFCORE-1667) After a full-replace-deployment operation on a managed domain in a composite operation onf of the enabled timestamp is not updated
James Perkins (JIRA)
issues at jboss.org
Sat Jul 23 01:00:02 EDT 2016
[ https://issues.jboss.org/browse/WFCORE-1667?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13269530#comment-13269530 ]
James Perkins commented on WFCORE-1667:
---------------------------------------
Also note the test may require a short sleep before the reads of the hash to ensure the deployment is complete. I've had it fail twice now with unmatched byte arrays.
> After a full-replace-deployment operation on a managed domain in a composite operation onf of the enabled timestamp is not updated
> ----------------------------------------------------------------------------------------------------------------------------------
>
> Key: WFCORE-1667
> URL: https://issues.jboss.org/browse/WFCORE-1667
> Project: WildFly Core
> Issue Type: Bug
> Components: Domain Management
> Reporter: James Perkins
> Assignee: Brian Stansberry
>
> When executing a {{full-replace-deployment}} in a composite operation the deployment associated with the first step does not get it's {{enabled-time}} attribute updated. The second one always has an updated attribute.
> I've created a test to show the odd behavior, https://github.com/wildfly/wildfly-core/commit/452e2149571c87ff4cfcdfbd78c39d9d994461b0. Note that if you change the order of the archive arguments on the redeploy you'll see the failure happens on the second deployment instead of the first.
> Do note that this test may not be needed, but it was an easy way to show what the issue is.
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)
More information about the jboss-jira
mailing list