[jboss-jira] [JBoss JIRA] (WFCORE-1667) After a full-replace-deployment operation on a managed domain in a composite operation onf of the enabled timestamp is not updated

Brian Stansberry (JIRA) issues at jboss.org
Mon Jul 25 10:29:00 EDT 2016


     [ https://issues.jboss.org/browse/WFCORE-1667?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Brian Stansberry reassigned WFCORE-1667:
----------------------------------------

    Assignee:     (was: Brian Stansberry)


> After a full-replace-deployment operation on a managed domain in a composite operation onf of the enabled timestamp is not updated
> ----------------------------------------------------------------------------------------------------------------------------------
>
>                 Key: WFCORE-1667
>                 URL: https://issues.jboss.org/browse/WFCORE-1667
>             Project: WildFly Core
>          Issue Type: Bug
>          Components: Domain Management
>            Reporter: James Perkins
>
> When executing a {{full-replace-deployment}} in a composite operation the deployment associated with the first step does not get it's {{enabled-time}} attribute updated. The second one always has an updated attribute.
> I've created a test to show the odd behavior, https://github.com/wildfly/wildfly-core/commit/452e2149571c87ff4cfcdfbd78c39d9d994461b0. Note that if you change the order of the archive arguments on the redeploy you'll see the failure happens on the second deployment instead of the first.
> Do note that this test may not be needed, but it was an easy way to show what the issue is.



--
This message was sent by Atlassian JIRA
(v6.4.11#64026)


More information about the jboss-jira mailing list