[jboss-jira] [JBoss JIRA] (DROOLS-1157) New Drools/jBPM Project Wizards are broken
Andrej Podhradsky (JIRA)
issues at jboss.org
Wed May 4 12:51:00 EDT 2016
[ https://issues.jboss.org/browse/DROOLS-1157?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Andrej Podhradsky closed DROOLS-1157.
-------------------------------------
Fix Version/s: 6.4.0.Final
Resolution: Done
Verified with JBDS 9.1.0.GA + JBDS-IS 9.0.0.GA (contains Drools 6.4.1.Final-v20160503-1355-B205)
> New Drools/jBPM Project Wizards are broken
> ------------------------------------------
>
> Key: DROOLS-1157
> URL: https://issues.jboss.org/browse/DROOLS-1157
> Project: Drools
> Issue Type: Bug
> Components: eclipse plugin
> Affects Versions: 6.4.0.Final
> Environment: Eclipse Mars, all platforms
> Reporter: Robert (Bob) Brodt
> Assignee: Robert (Bob) Brodt
> Priority: Blocker
> Labels: release_notes, verified_jbdsis-9.0.0
> Fix For: 6.4.0.Final
>
>
> Regressions were introduced in 6.4.0 of the Drools/jBPM Eclipse plugins (droolsjbpm-tools project) which caused the New Project Wizards to generate sample projects that do not build or run.
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)
More information about the jboss-jira
mailing list