[jboss-jira] [JBoss JIRA] (WFCORE-1370) All configuration changes have the same operation date
Brian Stansberry (JIRA)
issues at jboss.org
Tue May 10 15:50:00 EDT 2016
[ https://issues.jboss.org/browse/WFCORE-1370?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Brian Stansberry updated WFCORE-1370:
-------------------------------------
Fix Version/s: 2.2.0.CR1
> All configuration changes have the same operation date
> ------------------------------------------------------
>
> Key: WFCORE-1370
> URL: https://issues.jboss.org/browse/WFCORE-1370
> Project: WildFly Core
> Issue Type: Bug
> Components: Domain Management
> Affects Versions: 2.1.0.CR1
> Reporter: ehsavoie Hugonnet
> Assignee: ehsavoie Hugonnet
> Fix For: 2.2.0.CR1, 3.0.0.Alpha1
>
>
> When I list the changes, the operation date for all of the changes are the same, and seem to be the date/time when the `list-changes` operation is performed. I tried this just now with ER5:
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)
More information about the jboss-jira
mailing list