[jboss-jira] [JBoss JIRA] (ELY-689) CLI - between operations REMOVE and ADD CredentialStore alias is needed reload
Hynek Švábek (JIRA)
issues at jboss.org
Wed Oct 26 05:05:00 EDT 2016
[ https://issues.jboss.org/browse/ELY-689?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Hynek Švábek moved JBEAP-6631 to ELY-689:
-----------------------------------------
Project: WildFly Elytron (was: JBoss Enterprise Application Platform)
Key: ELY-689 (was: JBEAP-6631)
Workflow: GIT Pull Request workflow (was: CDW with loose statuses v1)
Component/s: Credential Store
(was: Security)
Affects Version/s: 1.1.0.Beta11
(was: 7.1.0.DR7)
> CLI - between operations REMOVE and ADD CredentialStore alias is needed reload
> ------------------------------------------------------------------------------
>
> Key: ELY-689
> URL: https://issues.jboss.org/browse/ELY-689
> Project: WildFly Elytron
> Issue Type: Bug
> Components: Credential Store
> Affects Versions: 1.1.0.Beta11
> Reporter: Hynek Švábek
> Assignee: Peter Skopek
>
> If I want remove entry from credential store and immediately I try to add new entry with same alias then I get error message
> {code}
> {
> "outcome" => "failed",
> "failure-description" => "WFLYCTL0158: Operation handler failed: java.lang.IllegalStateException: WFLYCTL0075: Duplicate resource csAlias001",
> "rolled-back" => true
> }
> {code}
> In case of reload after remove operation then adding entry with same alias passes.
> I cannot see any information about reload-required after executing remove operation.
> {code}
> {
> "outcome" => "success",
> "result" => undefined
> }
> {code}
> My suggestions
> # add there information about reload-required
> OR
> # fix it so it will not be necessary reload
> In my opinion second option is better.
--
This message was sent by Atlassian JIRA
(v7.2.2#72004)