[jboss-jira] [JBoss JIRA] (WFCORE-1883) Post-boot transition to/from acting as a master or slave HC must be done with management op execution locked out

Brian Stansberry (JIRA) issues at jboss.org
Wed Oct 26 12:50:00 EDT 2016


     [ https://issues.jboss.org/browse/WFCORE-1883?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Brian Stansberry reassigned WFCORE-1883:
----------------------------------------

    Assignee: Brian Stansberry


> Post-boot transition to/from acting as a master or slave HC must be done with management op execution locked out
> ----------------------------------------------------------------------------------------------------------------
>
>                 Key: WFCORE-1883
>                 URL: https://issues.jboss.org/browse/WFCORE-1883
>             Project: WildFly Core
>          Issue Type: Task
>          Components: Domain Management
>            Reporter: Brian Stansberry
>            Assignee: Brian Stansberry
>
> As part of WFCORE-338, a Candidate Domain Controller can shift between acting a master or acting as slave without requiring a reload or reboot.
> However, after initial boot, a DCC can be handling management requests. Any transition between acting as a master or slave to the other role must ensure that in-process management requests are not disrupted and that no new management requests are able to access the management model or runtime services until the transition is complete. As a practical matter this likely means that the transition task(s) must acquire the exclusive management lock and hold it until the transition is complete.



--
This message was sent by Atlassian JIRA
(v7.2.2#72004)


More information about the jboss-jira mailing list