[jboss-jira] [JBoss JIRA] (WFCORE-3151) Elytron reload-certificate-revocation-list operation should fail when invalid CRL file is used
Jan Kalina (JIRA)
issues at jboss.org
Mon Aug 7 06:39:00 EDT 2017
[ https://issues.jboss.org/browse/WFCORE-3151?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Jan Kalina moved JBEAP-12571 to WFCORE-3151:
--------------------------------------------
Project: WildFly Core (was: JBoss Enterprise Application Platform)
Key: WFCORE-3151 (was: JBEAP-12571)
Workflow: GIT Pull Request workflow (was: CDW with loose statuses v1)
Component/s: Security
(was: Security)
Affects Version/s: 3.0.0.Beta30
(was: 7.1.0.DR19)
> Elytron reload-certificate-revocation-list operation should fail when invalid CRL file is used
> ----------------------------------------------------------------------------------------------
>
> Key: WFCORE-3151
> URL: https://issues.jboss.org/browse/WFCORE-3151
> Project: WildFly Core
> Issue Type: Bug
> Components: Security
> Affects Versions: 3.0.0.Beta30
> Reporter: Jan Kalina
> Assignee: Jan Kalina
> Priority: Critical
> Labels: eap72
>
> Operation {{reload-certificate-revocation-list}} on Elytron {{trust-manager}} should fail when invalid CRL file is provided.
> When invalid file is provided, the operation succeed and an error raises in server log only with the first request. Old CRL is kept in use.
> An administrator should be immediately aware that reload of the CRL failed.
--
This message was sent by Atlassian JIRA
(v7.2.3#72005)
More information about the jboss-jira
mailing list